Tag : metal building
Whatever satisfies your inspector is probably all that you are legally required to do.
How do I ground a metal building or metal warehouse with metal frame sidings for proper inspection?
E&S Grounding Solutions Jun 9, 2017 0 133
Bought a 40X24 Metal frame with metal sidings building. No Elec or plumb at present, maybe later. Inspector requires grounding Metal Building. 1×5/8”x8’cu clad steel rod ok tied to Botton I-beam? Plan to use a rebar in slab to tie to metal frame in another place.
Popular Posts
-
What are driven rods and advanced driven rods?
E&S Grounding Solutions Oct 25, 2020 0 430
-
What is the Sphere of Influence?
E&S Grounding Solutions Jan 27, 2021 1 304
-
What Is An Acceptable Earth Ground Resistance Value?
E&S Grounding Solutions Dec 10, 2019 0 276
Our Picks
-
What is the Sphere of Influence?
E&S Grounding Solutions Jan 27, 2021 1 304
-
What are driven rods and advanced driven rods?
E&S Grounding Solutions Oct 25, 2020 0 430
-
What other types of grounding electrodes are there apart...
E&S Grounding Solutions Oct 25, 2020 0 245
-
What are the NEC Requirements for Grounding and Bonding...
E&S Grounding Solutions Aug 17, 2020 1 265
-
Should you make neutral-to-ground bonds in electrical panels?
E&S Grounding Solutions Aug 9, 2020 0 261
Categories
- Lightning(2)
- Grounding(9)
- Ask The Experts(33)